-
Freshwater Baseline Modelling Technical Report - March 2019 - Prepared for GWRC by Jacobs
alarm Published 01 Mar 2019 -
Freshwater Scenario Modelling Techncial Report - March 2019 - Prepared for GWRC by Jacobs
alarm Published 01 Mar 2019 -
TE KĀURU UPPER RUAMĀHANGA PROPOSED FLOODPLAIN MANAGEMENT PLAN - SUMMARY FOR PUBLIC CONSULTATION
A floodplain management plan is a document that describes the approach to flood and river management over the next 30-40 years. It describes various types of responses that will be…
alarm Published 01 Mar 2019 -
-
Appendix 8: Technical Review
This document contains the technical review of the Featherston Wastewater Treatment Plant consent application (WAR170229), which considers the proposed land discharge of treated wastewater to land and the associated assessment…
alarm Published 27 Feb 2019 -
Appendix F: Consent Level Beach Nourishment Design and Effects Assessment
This document contains the consent level design for the proposed beach nourishment that forms part of the shared path project. This is proposed as a strategy to mitigate the loss…
alarm Published 25 Feb 2019 -